The project is located in the eastern part of the English Channel (France), off the coast of Haute-Normandie about 13 km northwest of the town of Fécamp.

It will consist of the installation of 71 Siemens Gamesa 154-7.0MW direct-drive offshore wind turbines to be installed on gravity-based foundations.

The power generated by the wind farm will provide enough annual electricity to meet the energy needs of 770.000 people, or more than 60% of the population of the Seine-Maritime department

 

SOLUTION PROPOSED BY THE DELVALLE ENGINEERING TEAM

Delvalle designed as solution the IP68 junction boxes Geo Amphibox Series, a solution that is adapted to the high corrosiveness of wind platforms that are located in marine environments, thus avoiding problems in case of splashing waves, eventual immersions or water storms; this makes them a perfect solution for corrosive environments as they are made of AISI 316L stainless steel material.

In addition to providing various measures adapted to the special needs of offshore platforms, we have implemented the watertightness advantages of the IP68 approved Geo enclosures.

VANCOUVER INTERNATIONAL AIRPORT · Delvalle Box
Canada
Vancouver International Airport (YVR) has been a pioneer in implementing one of the most advanced...
Electrical control ensured in the world’s largest fusion reactor (ITER) · Delvalle Box
France
Delvalle has been selected as the supplier of Luxor series enclosures for six cryogenic lines in the...
Technological modernization of the Eurotunnel · Delvalle Box
France
As part of the innovative plan to modernise the toll stations of the Eurotunnel —one of the most...