The project includes the construction of three LNG trains, with a capacity of 6,6 mtpa. of LNG each, and at least 1.6 mtpa of stable gas condensate. The total LNG capacity of the three trains will be 19,8 mtpa. and the project employs an innovative construction concept using gravity-based structures (GBS).

The Utrenneye field is the resource base for Arctic LNG 2, the field is located in the Gydan peninsula in YNAO approximately 70 km.

In 2018, it was completed the front-end engineering design (FEED) and started site preparation, construction of early phase power supply facilities, production wells drilling, and construction of the quayside. To provide fabrication of the GBS, assembly and installation of topside modules, it was building the Offshore Superfacility construction center in Belokamenka near Murmansk. The center comprises two dry docks to build GBS, and facilities to manufacture topside modules.

 

SOLUTION PROPOSED BY DELVALLE ENGINEERING TEAM

After identifying stainless steel enclosures Tribeca Series as the perfect solution for the Russian Arctic.

Delvalle supplied customized enclosures Tribeca Series, this model is characterized by being robust, waterproof (IP66) and with a high resistance to the corrosion.

Cabinets for the meat industry (Casa Tarradellas) · Delvalle Box
Spain
With the aim of modernising its meat processing facilities, Casa Tarradellas entrusted Delvalle with...
Weighing terminal (port of Valencia) · Delvalle Box
Spain
At the APMT terminal in the Port of Valencia—one of the busiest in the Mediterranean—the new...
VANCOUVER INTERNATIONAL AIRPORT · Delvalle Box
Canada
Vancouver International Airport (YVR) has been a pioneer in implementing one of the most advanced...
Electrical control ensured in the world’s largest fusion reactor (ITER) · Delvalle Box
France
Delvalle has been selected as the supplier of Luxor series enclosures for six cryogenic lines in the...