Blue Marlin Combined Cycle

A project of this nature (combined cycle) requires knowledge and experience in power generation due to the coexistence of two thermodynamic cycles in the same system, one whose working fluid is steam and the other whose working fluid is a gas product of combustion or burning. Both processes require specific sophistication and knowledge to ensure the safety and integrity of the facility.

In this case, the project involves the planning, implementation and operation of the UTE Nossa Senhora de Fátima Gas Thermoelectric Plant in Macaé, in the state of Rio de Janeiro. A separate carbon steel pipeline to supply gas to the plant, a transmission line with 9 towers connecting the existing substation, a water supply line from the Macaé River and an outfall for treated effluent to be released into the river. 

Technical complexity requires having outdoor electrical enclosures and cabinets with the highest resistance to corrosion, which guarantee perfect watertightness and a long service life for the equipment inside. We proposed a two-fold solution: stainless steel wall enclosures Luxor Series and stainless steel junction boxes Geo Serieswhose features are specifically designed for facilities with these requirements and for locations in chemically aggressive environments.

Home > Cases of Success > Blue Marlin Combined Cycle
Caso de éxito
Blue Marlin Combined Cycle

A project of this nature (combined cycle) requires knowledge and experience in power generation due to the coexistence of two thermodynamic cycles in the same system, one whose working fluid is steam and the other whose working fluid is a gas product of combustion or burning. Both processes require specific sophistication and knowledge to ensure the safety and integrity of the facility.

In this case, the project involves the planning, implementation and operation of the UTE Nossa Senhora de Fátima Gas Thermoelectric Plant in Macaé, in the state of Rio de Janeiro. A separate carbon steel pipeline to supply gas to the plant, a transmission line with 9 towers connecting the existing substation, a water supply line from the Macaé River and an outfall for treated effluent to be released into the river. 

Technical complexity requires having outdoor electrical enclosures and cabinets with the highest resistance to corrosion, which guarantee perfect watertightness and a long service life for the equipment inside. We proposed a two-fold solution: stainless steel wall enclosures Luxor Series and stainless steel junction boxes Geo Serieswhose features are specifically designed for facilities with these requirements and for locations in chemically aggressive environments.

Cases
of
success
Each project represents a new challenge and an opportunity to apply our technical knowledge, accumulated experience and commitment to excellence. These are real solutions developed by the DelValle team, where engineering, innovation and closeness to the customer translate into tangible results.

From the need to the solution.
This is how we turn every project into a success story.

talk to our

experts

Our team of engineers and consultants is at your disposal to analyze your project in depth and propose the most suitable, efficient and aligned alternative.

We put engineering at the service of your challenges.

Suscríbete

y toma la delantera

Al suscribirte, accedes a información privilegiada clave para tu sector, actualizaciones en normativas y ofertas especiales.

Mantente informado y obtén ventajas que harán la diferencia en tus nuevos proyectos: