The Loma Gorda wind farm, composed of 7 turbines, generates 70 GWh/year, which is enough energy to supply 17,800 families. Its commissioning reduces CO² emissions by 46,000 tonnes each year.
This type of installation in which there are several electrical cabinets requires an enclosure with a long service life. In this case, depending on the degree of exposure and the climate zone to which it is exposed, a Luxor Series galvanised can have a service life of well over 10 years.
The Loma Gorda wind farm, composed of 7 turbines, generates 70 GWh/year, which is enough energy to supply 17,800 families. Its commissioning reduces CO² emissions by 46,000 tonnes each year.
This type of installation in which there are several electrical cabinets requires an enclosure with a long service life. In this case, depending on the degree of exposure and the climate zone to which it is exposed, a Luxor Series galvanised can have a service life of well over 10 years.
From the need to the solution.
This is how we turn every project into a success story.
talk to our
experts
Our team of engineers and consultants is at your disposal to analyze your project in depth and propose the most suitable, efficient and aligned alternative.
We put engineering at the service of your challenges.
Al suscribirte, accedes a información privilegiada clave para tu sector, actualizaciones en normativas y ofertas especiales.
Mantente informado y obtén ventajas que harán la diferencia en tus nuevos proyectos: